Mathematics
Mathematics, 18.02.2022 01:30, michaelwarren8728

A bicycle manufacturing company makes a particular type of bike. Each child bike requires 4 hours to build and 4 hours to test. Each adult bike requires 6 hours to build and 4 hours to test. With the number of workers, the company is able to have up to 120 hours of building time and 100 hours of testing time for a week. If c represents child bikes and a represents adult bikes, can the company build 10 child bikes and 12 adult bikes in a week? (1 point) No, because the bike order does not meet the restrictions of 4c + 6a ≀ 120 and 4c + 4a ≀ 100 No, because the bike order does not meet the restrictions of 4c + 4a ≀ 120 and 6c + 4a ≀ 100 Yes, because the bike order meets the restrictions of 4c + 6a ≀ 120 and 4c + 4a ≀ 100 Yes, because the bike order meets the restrictions of 4c + 4a ≀ 120 and 6c + 4a ≀ 100

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:00, laylay4527
One card is dealt from a 52 card deck. find the probability that the dealt card is a 4 or a black 7
Answers: 2
image
Mathematics, 21.06.2019 18:10, sonyfan
Which of these tables represents a non-linear function?
Answers: 1
image
Mathematics, 21.06.2019 18:30, gracebuffum
How far could you drive on 50 gallons of gas
Answers: 2
image
Mathematics, 21.06.2019 19:00, JvGaming2001
The probability that you roll a two on a six-sided die is 1 6 16 . if you roll the die 60 times, how many twos can you expect to roll
Answers: 1
Do you know the correct answer?
A bicycle manufacturing company makes a particular type of bike. Each child bike requires 4 hours to...

Questions in other subjects:

Konu
Mathematics, 21.10.2020 07:01
Konu
English, 21.10.2020 07:01
Konu
Advanced Placement (AP), 21.10.2020 07:01