Mathematics
Mathematics, 17.02.2022 07:50, cofran

A construction crew needs to pave a road that is 202 miles long. The crew paves 8 miles of the road each day. The length, L (in miles), that is left to be paved after d days is given by the following function. L(d)= 202-8d
Answer the following questions.
a) How many miles of the road does the crew have left to pave after 13 days?
___miles
b) If 138 miles of the road is left to be paved, how many days has the crew been paving the road?
___days

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:00, Michael845313
Acircular garden with radius of 8 feet is surrounded by a circular path with a width of 3 feet. what is the approximate area of the path alone? use 3.14 for π
Answers: 3
image
Mathematics, 21.06.2019 21:00, noahdwilke
What is the unit rate of, 75% high fiber chimp food to 25% high protein chimp food.
Answers: 1
image
Mathematics, 21.06.2019 22:00, pandyjunk3981
Let event a = you roll an even number on the first cube. let event b = you roll a 6 on the second cube. are the events independent or dependent? why?
Answers: 1
image
Mathematics, 21.06.2019 23:30, miko96
Identify the slope an intercept of the following linear equation y = 1/5x - 6 a. slope: 1/5; intercept: -6 b. slope: 5; intercept: -6 c. slope: -1/5; intercept: 6 d. slope: 1/5; intercept: 6
Answers: 2
Do you know the correct answer?
A construction crew needs to pave a road that is 202 miles long. The crew paves 8 miles of the road...

Questions in other subjects:

Konu
Mathematics, 12.08.2020 05:01
Konu
Chemistry, 12.08.2020 05:01
Konu
Mathematics, 12.08.2020 05:01