Mathematics
Mathematics, 03.02.2022 21:50, dmoore222

A bicycle manufacturing company makes a particular type of bike. Each child bike requires 4 hours to build and 4 hours to test. Each adult bike requires 6 hours to build and 4 hours to test. With the number of workers, the company is able to have up to 120 hours of building time and 100 hours of testing time for a week. If c represents child bikes and a represents adult bikes, can the company build 60 child bikes and 6 adult bikes in a week? (1 point)

answer
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:40, ayoismeisalex
What are the solutions to the equation 4x2+3x=24-x
Answers: 2
image
Mathematics, 21.06.2019 20:00, genyjoannerubiera
The weight v of an object on venus varies directly with its weight e on earth. a person weighing 120 lb on earth would weigh 106 lb on venus. how much would a person weighing 150 lb on earth weigh on venus?
Answers: 2
image
Mathematics, 21.06.2019 22:30, verdolaga2017me
Will mark determine whether the conjecture is true or false. give a counterexample for any false conjecture. given: points r, s, and t conjecture: r, s, and t are coplanar. a) false; the points do not have to be in a straight line. b) true c) false; the points to not have to form right angles. d) false; one point may not be between the other two.
Answers: 1
image
Mathematics, 22.06.2019 02:00, nininichole431
Which expression represents the total perimeter of her sandwich, and if x = 1.2, what is the approximate length of the crust?
Answers: 2
Do you know the correct answer?
A bicycle manufacturing company makes a particular type of bike. Each child bike requires 4 hours to...

Questions in other subjects:

Konu
Chemistry, 11.10.2021 18:00