Mathematics
Mathematics, 20.01.2022 01:20, Saberabuomar2007

On a certain workday, the rate, in tons per hour, at which unprocessed gravel arrives at a gravel processing plant is

modeled by G(t) = 90 + 45 cos (t), where t is

measured in hours and 0
the workday (t=0), the plant has 500 tons of unprocessed

gravel. During the hours of operations, 0
plant processes gravel at a constant rate of 100 tons per

hour.

c.) Is the unprocessed gravel at the plant increasing or

decreasing at time t=5 hours? Show the work that leads

to your answer.

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:00, bailey1025
5× 1/2 = ? a) more than 5 because you are multiplying by a whole number b) 5/10 because you multiply the numerator and denominator by 5 c) less than 5 because you are multiplying by a number that is more than 1 d) less than 5 because you are multiplying by a number that is less than 1
Answers: 3
image
Mathematics, 21.06.2019 17:50, MrKrinkle77
Segment ab is shown on the graph. which shows how to find the x-coordinate of the point that will divide ab into a 2: 3 ratio using the formula
Answers: 2
image
Mathematics, 21.06.2019 20:00, anthonybowie99
The art class is planning to paint a mural on an outside wall. this figure is a scale drawing of the wall. width: 11 in length: 28 in unit rate: 1.5 ft per in. write the ratio of the area of the drawing to the area of the actual mural. write your answer as a unit rate. show that this unit rate is equal to the square of the unit rate 1.5 ft per in
Answers: 1
image
Mathematics, 21.06.2019 22:30, glosstear
An 18% discount on a watch saved a shopper $72. find the price of the watch before the discount
Answers: 1
Do you know the correct answer?
On a certain workday, the rate, in tons per hour, at which unprocessed gravel arrives at a gravel...

Questions in other subjects:

Konu
Biology, 23.10.2020 08:01