Mathematics
Mathematics, 14.12.2021 07:40, brevinsparks4

A special drill is used at a construction site to dig holes. A hole is dug to a depth of 2.75 feet when the drill hits rock. The progress slows to 5/6 feet per hour of digging. The depth of the hole must be at least 10 1/2 feet by the end of the day to stay on schedule. What is the minimum amount of time the drill must continue at its present rate to complete the hole on schedule? Select from the drop-down menus to correctly complete the statement.

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 22.06.2019 00:40, sselect1
Calculate the annual effective interest rate of a 12 % nominal annual interest rate compound monthly
Answers: 1
image
Mathematics, 22.06.2019 02:00, powella033
Acompound inequality is graphed, and its graph consists of all real numbers. which open scentence could have resulted in this solution set r> 3 or r< -2. r< 3 or r< -2. r> 3 or r> -2. r< 3 or r> -2 plz asap
Answers: 1
image
Mathematics, 22.06.2019 02:00, ballbritez
Student representatives surveyed their classmates on their preference of a school mascot for a new school. the results are shown in the table below. which pair of samples seems most representative of student preference?
Answers: 2
image
Mathematics, 22.06.2019 02:10, kallie862
The price of one share of a company’s stock declined $13.89 every day for 2.5 days what was the stocks total decline in price
Answers: 1
Do you know the correct answer?
A special drill is used at a construction site to dig holes. A hole is dug to a depth of 2.75 feet w...

Questions in other subjects:

Konu
Computers and Technology, 27.07.2019 10:20