Mathematics
Mathematics, 12.12.2021 14:30, robertsabbiegale

You are newly hired in a soft drink making company. The company decided to introduce a new brand with the addition of mint in its existing flavor. The company also wants to introduce this new brand in
some attractive tin pack in different quantity. They want to introduce 400ml and one liter tin packs for
the promotion of their brand. For making these tin packs the cost of the top and bottom of a tin is 5/3
times the cost of the body/cylinder. The company assign you to suggest the dimensions of the required
tin packs which also minimize the cost of production of the tin packs. The cost of per meter square is 2$. Moreover, check whether there
are more options or is only one option to construct the required tin packs to get optimize solution.
Furthermore, the total budget for this new brand was assigned only $1 million. Therefore, also find how
many tin packs of two sizes must be prepared to get the maximum profit if there is profit on each tin of
400ml is one dollar and $3 for each tin pack of one liter.

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:00, OKgoogle
What is the value of x in the diagram below?
Answers: 2
image
Mathematics, 21.06.2019 20:00, Dashavu7165
How many grams the dog will eat in 3 days?
Answers: 1
image
Mathematics, 21.06.2019 20:00, kedest
What is the radical expression that is equivalent to the expression 27 1 over 5?
Answers: 3
image
Mathematics, 21.06.2019 23:00, DisneyGirl11
In an equilateral triangle, each angle is represented by 5y+3. what is the value of y? a. 9.7 b. 10.8 c. 11.4 d. 7.2
Answers: 1
Do you know the correct answer?
You are newly hired in a soft drink making company. The company decided to introduce a new brand w...

Questions in other subjects:

Konu
Spanish, 14.12.2021 19:00
Konu
Mathematics, 14.12.2021 19:00