Mathematics
Mathematics, 06.12.2021 06:50, Dogtes9667

A construction company needs to remove 2 5/6 tons of dirt from a construction site. They can remove 3/10 tons of dirt each hour. What is the total amount of hours it will take to remove the dirt?

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:00, laylay4527
One card is dealt from a 52 card deck. find the probability that the dealt card is a 4 or a black 7
Answers: 2
image
Mathematics, 21.06.2019 17:30, rosie20052019
One positive number is 9 more than twice another. if their product is 95, find the numbers
Answers: 1
image
Mathematics, 21.06.2019 18:00, RickyGotFanz4867
What is the upper quartile in the box plot?
Answers: 1
image
Mathematics, 21.06.2019 18:30, tangia
The base of a triangle exceeds the height by 9 inches. if the area is 180 square inches, find the length of the base and the height of the triangle.
Answers: 3
Do you know the correct answer?
A construction company needs to remove 2 5/6 tons of dirt from a construction site. They can remove...

Questions in other subjects:

Konu
Mathematics, 08.10.2021 14:00