Mathematics
Mathematics, 06.12.2021 05:40, angie249

A mass production line manufactures products of which 10% are faulty. A quality assurance (QA) expert samples products from the production line until he finds a defective product. a. What is the variable under study? (1.5) b. What is the probability that the QA expert sampled at least two products until he got the first defective product? (3) c. Find out the average number of sampled products to get the first defective product. (1.5) d. Also find out the standard deviation of the sampled products to get the first defective product. (1.5)

answer
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:00, ayoismeisjjjjuan
Which shows the pre image of triangle xyz
Answers: 1
image
Mathematics, 21.06.2019 22:30, qveensentha59
Which of the functions below could have created this graph?
Answers: 1
image
Mathematics, 21.06.2019 23:00, nataliemakin7123
Which rectangle if translated 6 units right and 16 units down and the rotated 90° clockwise about the point (4, -11) will result in rectangle e?
Answers: 2
image
Mathematics, 22.06.2019 00:20, kaybec2386
Data for the height of a model rocket launch in the air over time are shown in the table. darryl predicted that the height of the rocket at 8 seconds would be about 93 meters. did darryl make a good prediction? yes, the data are best modeled by a quadratic function. the value of the function at 8 seconds is about 93 meters. yes, the data are best modeled by a linear function. the first differences are constant, so about 93 meters at 8 seconds is reasonable. no, the data are exponential. a better prediction is 150 meters. no, the data are best modeled by a cubic function. a better prediction is 100 meters.
Answers: 2
Do you know the correct answer?
A mass production line manufactures products of which 10% are faulty. A quality assurance (QA) exper...

Questions in other subjects:

Konu
Mathematics, 29.10.2020 02:10