Mathematics
Mathematics, 01.12.2021 04:30, Larinadiaz5554

you are planning to use PERT for planning of your project. A task has pessimistic estimate of 24 days, most likely estimate of 15 days and optimistic estimate of 12 days. what is the mean using the PERT technique

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 22.06.2019 00:10, zarbyp30
Given: p: 2x = 16 q: 3x – 4= 20 which is the converse of p - q? if 2x + 16, then 3x - 4 20. if 3x –4 +20, then 2x # 16. lf 2x = 16, then 3x - 4 = 20. lf 3x – 4= 20, then 2x = 16. o o
Answers: 1
image
Mathematics, 22.06.2019 01:00, autumnrose02
Anew landowner is interested in constructing a fence around the perimeter of her property. her property is 1,080√30 feet wide and 500√20 feet long. what is the perimeter of the property? (recall that the perimeter is the sum of each side of a shape or boundary). a 1,580√40 feet b. 5,320√5 feet c. 3,160√20 feet d. 10,640√5 feet
Answers: 3
image
Mathematics, 22.06.2019 02:00, love12236
Th perimeter of a rectangular garden is 150 feet. the length is 50 feet longer than the width, w. which equation could be used to calculate the width of the garden? a.) 2w+ 2(w-50) =150 b.) 2w+50 + 2w =150 c.) 2(w+50) + w =150 d.) 2w+ 2(w + 50) = 150 need asap. will give brainliest !
Answers: 1
image
Mathematics, 22.06.2019 06:20, megaaan214p61pb7
What is the solution to the system of equations below? y=-1/3x+6 and y= 1/3x-6ono solutioninfinitely many solutions(-18, 12)(18,0)
Answers: 3
Do you know the correct answer?
you are planning to use PERT for planning of your project. A task has pessimistic estimate of 24 day...