Mathematics, 23.11.2021 21:20, Gheaton1889
An automobile manufacturer makes cars and trucks in a factory that divided up into two different shops. The fist shop, which does the basic assembly, needs 2 workers days per truck and 5 worker days per car. The second shop, which does the finishing touches, needs 3 worker days for both cars and trucks. The first shop has 180 worker days available per week and the second shop has 135 worker days available. The profit per car is $400 and the profit per truck is $600. How many of each type should be produced in order to maximize profit? What is the maximum profit?
Answers: 2
Mathematics, 22.06.2019 00:30, lacourboud20005
You are riding your bike and notice the square sign above. you mentally draw a straight line from point a to c. describe the angle relationship between dca and bca
Answers: 1
Mathematics, 22.06.2019 06:00, camosloppy7677
The girls used two different recipes for making apple pies. dinas pie baked for 2/3 hour. vals pie baked for 0.75 hour. whos pie had the longer bsking time?
Answers: 1
An automobile manufacturer makes cars and trucks in a factory that divided up into two different sho...
Mathematics, 06.02.2021 14:50
Mathematics, 06.02.2021 15:00
Biology, 06.02.2021 15:00
History, 06.02.2021 15:00
Physics, 06.02.2021 15:00