The cost to run Machine 1 for an hour is $2. During that hour, Machine 1 produces 240 bolts and 100 nuts. The cost
to run Machine 2 for an hour is $2.40. During that hour,
Machine 2 produces 160 bolts and 160 nuts. With a combined
running time of no more than 30 hours, how long should
each machine run to produce an order of at least 2080 bolts
and 1520 nuts at the minimum operating cost?

this is applications of linear programming


The cost to run Machine 1 for an hour is $2. During that

hour, Machine 1 produces 240 bolts and 1

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 19:00, coryowens44
Write a fraction less than 1, which has a denominator of 6 and is greater than 3/4 plz answer !
Answers: 1
image
Mathematics, 21.06.2019 23:00, Gaby702
What is the sum of these mixed numbers 4 2/3+ 3 1/9
Answers: 2
image
Mathematics, 22.06.2019 00:00, aaron2113
Y=21.95x+10 y=22.45x solve by substitution
Answers: 1
image
Mathematics, 22.06.2019 01:00, dyllanmasters99
Determine the intercepts of the line that passes through the following points. (15,-3)(15,−3) (20,-5)(20,−5) (25,-7)(25,−7)
Answers: 1
Do you know the correct answer?
The cost to run Machine 1 for an hour is $2. During that hour, Machine 1 produces 240 bolts and 10...

Questions in other subjects:

Konu
Mathematics, 30.08.2020 01:01
Konu
Mathematics, 30.08.2020 01:01