Mathematics
Mathematics, 19.10.2021 03:10, mdlnlcs

158 ft. An engineering company was hired to dig an underground tunnel directly from

point A to point B, which was a distance of 1.4 miles. By mistake, however, they

tunneled from point A to point C. Then they tunneled from point C to point B. If

tunneling costs about $120 million per mile, about how much money was wasted?

Show how you found your answer. (Note: 1 mile = 5,280 feet)

answer
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:00, cat216
Omar is going on a road trip! the car rental company offers him two types of cars. each car has a fixed price, but he also needs to consider the cost of fuel. the first car costs $90 to rent, and because of its fuel consumption rate, there's an additional cost of s0.50 per kilometer driven.
Answers: 2
image
Mathematics, 21.06.2019 18:50, xlebrny1215
Which translation maps the vertex of the graph of the function f(x) = x2 onto the vertex of the function g(x) = x2 – 10x +2?
Answers: 1
image
Mathematics, 21.06.2019 19:10, iziyahh902
How many solutions does the nonlinear system of equations graphed below have?
Answers: 2
image
Mathematics, 21.06.2019 21:00, hernandez09297
At oaknoll school, 90 out of 270 students on computers. what percent of students at oak knoll school do not own computers? round the nearest tenth of a percent.
Answers: 1
Do you know the correct answer?
158 ft. An engineering company was hired to dig an underground tunnel directly from

po...