Mathematics
Mathematics, 06.10.2021 17:20, erikap0889

A firm manufactures two products; the net profit on product 1 is Rupees 3 per unit and Rupees 5 per unit on product 2. The manufacturing process is such that each product has to be processed in two departments D1 and D2. Each unit of product1 requires processing for 1 minute at D1 and 3 minutes at D2; each unit of product 2 requires processing for 2 minutes at D1 and 2 minutes at D2. Machine time available per day is 860 minutes at D1 and 1200 minutes at D2. How much of product 1 and 2 should be produced every day so that total profit is maximum. Make the mathematical model for the given problem.

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 18:00, bravomichelle75
Aschool puts on a play. the play costs $1,200 in expenses. the students charge $4.00 for tickets. there will be one performance of the play in an auditorium that seats 500 people. what is the domain of the function that shows the profit as a function of the number of tickets sold?  
Answers: 2
image
Mathematics, 21.06.2019 20:30, destinyharris8502
Iā€™m on question 7 it says a covered water tank is in the shape of a cylinder the tank has a 28 inch diameter and a height of 66 inches to the nearest square inch what is the surface area of the water tank
Answers: 2
image
Mathematics, 21.06.2019 22:00, anastasiakonni1
Jayne is studying urban planning and finds that her town is decreasing in population by 3% each year. the population of her town is changing by a constant rate. true or false?
Answers: 3
image
Mathematics, 21.06.2019 22:30, patrickfryer240
When i'm with my factor 5, my prodect is 20 .when i'm with my addend 6' my sum is 10.what number am i
Answers: 1
Do you know the correct answer?
A firm manufactures two products; the net profit on product 1 is Rupees 3 per unit and Rupees 5 per...

Questions in other subjects:

Konu
History, 05.05.2020 14:53
Konu
Mathematics, 05.05.2020 14:53
Konu
English, 05.05.2020 14:53