Mathematics
Mathematics, 01.10.2021 18:50, oaaliyah505

The freeway construction crew pours 300 feet of concrete in a day. Discrete or continuous model?

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 20:00, anabelleacunamu
Find the value of x. round the length to the nearest tenth
Answers: 1
image
Mathematics, 21.06.2019 20:00, Queenashley3232
Combine like terms to make a simpler expression 3z+z
Answers: 2
image
Mathematics, 22.06.2019 00:30, citlalli30
Candice uses the function f(t)=t+100−−−−−−√ to model the number of students in her after-school program. the variable t represents days and f(t) represents the number of students. how many days does it take for there to be 15 students in her program? a. 225 days b. 125 days c. 325 days d. 115 days
Answers: 2
image
Mathematics, 22.06.2019 04:20, jmayy8223
When constructing a perpendicular line through a point off a line, how can you verify that the lines constructed are perpendicular? check the angles used in the construction with a straightedge to ensure consistency. check the distance along the lines at several places with a compass to ensure they are the same length. check the intersecting lines with the corner of a piece of paper to ensure the lines create 90° angles. check the distance between the lines at several places with a compass to ensure they are equidistant. question 2(multiple choice worth 1 points) (01.03 lc) which of the following steps is included in the construction of a perpendicular line through a point on a line? connect arcs that are above and below the given line with a straightedge. connect arcs that are above the original line with a straightedge. create arcs on either side of a point that is off the given line. create a copied angle by using the first two lines as the original angle.
Answers: 1
Do you know the correct answer?
The freeway construction crew pours 300 feet of concrete in a day. Discrete or continuous model?...

Questions in other subjects: