Answers: 2
Mathematics, 21.06.2019 21:30, mandyangle01
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
Mathematics, 21.06.2019 22:00, kingalex7575
The serenity and the mystic are sail boats. the serenity and the mystic start at the same point and travel away from each other in opposite directions. the serenity travels at 16 mph and the mystic travels at 19 mph. how far apart will they be in 3 hours?
Answers: 1
Mathematics, 22.06.2019 00:30, Ramirez72
If you were constructing a triangular frame, and you had wood in the length of 4inches, 4 inches, and 7 inches, would it make a triangle? would you be able to create a frame from these pieces of wood? yes or no. explain your mathematical thinking
Answers: 2
What factors do 8 anf 12 have in common?...
English, 11.02.2021 04:00
English, 11.02.2021 04:00
Mathematics, 11.02.2021 04:00
Computers and Technology, 11.02.2021 04:00
English, 11.02.2021 04:00