Mathematics
Mathematics, 12.09.2021 03:50, amunson40

1 On average, it takes a shoe factory 21 minutes, with a standard deviation of 3 minutes, to manufacture a pair of
running shoes. How often will it take the factory more than 27 minutes to manufacture a pair of running shoes?
Note: Ansume that a Normal model is appropriate for the distribution of manufacturing times.
A. It takes the factory more than 27 minutes to manufacture a pair of running shoes about 47.5% of
the time
3. It takes the factory more than 27 minutes to manufacture a pair of running shoes about 2.5% of
the time
c. It takes the factory more than 27 minutes to manufacture a pair of running shoes about 95% of
the time
D. it takes the factory more than 27 minutes to manufacture a pair of running shoes about 5% of the
time.
You

answer
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:30, trentonmccary2096
Consider 6x2 + 6x + 1. which term immediately tells you that this expression is not a perfect square trinomial? justify your answer
Answers: 2
image
Mathematics, 21.06.2019 19:10, slm1595
Pranza plotted point a in the coordinate plane below.
Answers: 2
image
Mathematics, 21.06.2019 20:30, catcatscats122
Write two point-slope equations for the line passing through the points (6, 5) and (3, 1)
Answers: 1
image
Mathematics, 21.06.2019 21:00, xojade
The measure of angle 0 is 600 degrees
Answers: 1
Do you know the correct answer?
1 On average, it takes a shoe factory 21 minutes, with a standard deviation of 3 minutes, to manuf...

Questions in other subjects:

Konu
Social Studies, 28.01.2020 04:31