Mathematics
Mathematics, 08.09.2021 09:00, Calirose

A company found that an experienced surveyor can survey a roadbed in 3 hours. An apprentice surveyor needs 5 hours to survey how long it takes them to complete the job.
Both surveyor together can complete the job in hr.

answer
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 14:30, mustachegirl311
Use the multiplier method to incrases Ā£258 by 43%
Answers: 1
image
Mathematics, 21.06.2019 16:20, zay65307
Two positive integers are 3 units apart on a number line. their product is 108. which equation can be used to solve for m, the greater integer? m(m ā€“ 3) = 108 m(m + 3) = 108 (m + 3)(m ā€“ 3) = 108 (m ā€“ 12)(m ā€“ 9) = 108
Answers: 1
image
Mathematics, 21.06.2019 16:30, emilyanneK2540
Jackie purchased 3 bottles of water and 2 cups of coffee for a family for $7.35. brian bought 4 bottles of water and 1 cup of coffee for his family for $7.15. how much does each bottle of water cost? how much does each cup of coffee cost? i need this done
Answers: 3
image
Mathematics, 21.06.2019 16:30, lanakay2006
We have enough material to build a fence around a station that has a perimeter of 180 feet the width of the rectangular space must be 3 1/4 feet what must the length be
Answers: 1
Do you know the correct answer?
A company found that an experienced surveyor can survey a roadbed in 3 hours. An apprentice surveyor...

Questions in other subjects:

Konu
Mathematics, 07.07.2019 06:30
Konu
Mathematics, 07.07.2019 06:30
Konu
Mathematics, 07.07.2019 06:30
Konu
Mathematics, 07.07.2019 06:30