Mathematics
Mathematics, 10.08.2021 05:20, lilpump3506

You have been charged with developing a time standard for a certain task. In a preliminary study, you timed one worker perform the task 13 times with an average observed time of 12 seconds and a standard deviation of 2.5 seconds. What is the standard time for this task if the employee worked at a 10.7 slower pace than average, and an allowance of 28.3 percent of job time is used

answer
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 14:30, sierraseideman1023
If given an equation of a line such as -1/2x+6 how would you create an equation of a line parallel and perpendicula to this line that goes through another point such as (4,10)
Answers: 1
image
Mathematics, 21.06.2019 21:00, madisin21
Which zero pair could be added to the function f(x) = x2 + 12x + 6 so that the function can be written in vertex form? o 3, -3o 6,629,-936, 36
Answers: 3
image
Mathematics, 21.06.2019 21:30, ag1606
Which graph has a rate of change of zero
Answers: 1
image
Mathematics, 21.06.2019 22:00, foreverrocky12p2asun
Consider the triangle. which shows the order of the angles from smallest to largest? angle a, angle b, angle c angle b, angle a, angle c angle b, angle c, angle a angle c, angle a, angle b
Answers: 3
Do you know the correct answer?
You have been charged with developing a time standard for a certain task. In a preliminary study, yo...

Questions in other subjects:

Konu
Mathematics, 26.03.2021 21:20