Mathematics, 28.07.2021 01:00, XAINEE

Tonya has a contract to plant saplings along the median of a highway. Prior to starting the work, she estimated that she would need 40 saplings to complete the contracted work and that it would take an average of 10 minutes to plant each sapling. Was the amount of time that it took her to complete the work no more than 95 percent of her estimated total time

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 15:30, makaylapink8167
The tiles below are pieces of a normal ecg tracing representing a little less than two heartbeats at a resting rate of 80 bpm. arrange the tiles in their correct order. rank from first to last. do not overlap any tiles.
Answers: 1
image
Mathematics, 21.06.2019 20:40, stotherow5
Describe the symmetry of the figure. identify lines of symmetry, if any. find the angle and the order of any rotational symmetry.
Answers: 1
image
Mathematics, 21.06.2019 21:30, vaelriacb5317
Is triangle jkl congruent to triangle rst? if so, what is the scale factor?
Answers: 1
image
Mathematics, 21.06.2019 23:30, SmolBeanPotato
If the perimeter of the garden is 37 ft. the width is x and the length is 15 ft. what is the width of the garden in feet?
Answers: 2
Do you know the correct answer?
Tonya has a contract to plant saplings along the median of a highway. Prior to starting the work, sh...

Questions in other subjects: