Mathematics
Mathematics, 20.07.2021 04:10, hartzpeyton136

A construction crane lifts a bucket of sand originally weighing 145 lbs at a constant rate. Sand is lost from the bucket at a constant rate of .5lbs/ft. How much work is done in lifting the sand 80ft?

answer
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:00, joelpimentel
Asailor is looking at a kite. if he is looking at the kite at an angle of elevation of 36and the distance from the boat to the point where the kite is directly overhead is 40 feet, how high is the kite?
Answers: 3
image
Mathematics, 21.06.2019 19:30, nyceastcoast
Explain how you can find the missing fraction in 3 4/5 / (blank) 2 5/7. then find the missing fraction.
Answers: 2
image
Mathematics, 22.06.2019 00:00, Savy8595
Can someone me with this graph problem by the way i need to know the answers by today since this assignment is due ! !
Answers: 1
image
Mathematics, 22.06.2019 00:00, hannahgracew12
Which is a logical conclusion based on the given information? a. figure abcd is a rhombus by the definition of a rhombus. b. segment ac is congruent to segment dc by cpctc. c. angle acb is congruent to angle adc by the angle-side-angle theorem. d. triangle acd is congruent to triangle cab by the hypotenuse-leg theorem.
Answers: 1
Do you know the correct answer?
A construction crane lifts a bucket of sand originally weighing 145 lbs at a constant rate. Sand is...

Questions in other subjects:

Konu
Mathematics, 23.06.2020 10:57