Mathematics
Mathematics, 15.07.2021 20:40, nanagardiner08

Two workers finished a job in 12 days. How long would it take each worker to do the job by himself if one of the workers needs 10 more days to finish the job than the other worker

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:00, Rainey1664
In the 30-60-90 triangle below side s has a length of and side r has a length
Answers: 2
image
Mathematics, 21.06.2019 22:00, nijanicole164
Out of 50 students surveyed, 16 have a dog. based on these results, predict how many of the 280 students in the school have a dog.
Answers: 2
image
Mathematics, 21.06.2019 23:30, youngboymark123
Kristen is wrapping presents for the holidays. she has a box that measures 4 ft. x 2 ft. x 2 ft. how many square feet of wrapping paper does she need to cover the box without overlapping?
Answers: 1
image
Mathematics, 22.06.2019 04:10, toottoot42169
Random variables x poisson~ ( a) ,y poisson ~ ( a) . x and y are independent. if 2 1, 2 1. u =2x+ y-1, v=2x- y +1. find: ) cov (u ,v ).
Answers: 2
Do you know the correct answer?
Two workers finished a job in 12 days. How long would it take each worker to do the job by himself i...

Questions in other subjects:

Konu
Mathematics, 29.07.2020 21:01
Konu
Mathematics, 29.07.2020 21:01