To the requirement of a customer, the output eta Machine shop is organized so that the number e Component, produced
on each working day is 5 7 than the previous day-
On the first day, 25 Components are to be produced manufacted
and the production is to be stoped and the total
3
2430
Components are produced - How many working day will
required to continue
the order.

answer
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:30, GalaxyWolf1895
An automated water dispenser fills packets with one liter of water on average, with a standard deviation of 5 milliliter. the manual says that after a year of operation the dispenser should be tested to see if it needs recalibration. a year later a number of filled packets are set aside and measured separately. it is found that the average packet now contains about 0.995 liters. does the dispenser need calibration? explain your answer.
Answers: 2
image
Mathematics, 21.06.2019 20:00, mewings
With finding limits of multi variable !
Answers: 1
image
Mathematics, 21.06.2019 20:00, ashl3yisbored
The length of the line segment joining the midpoints of sides ab and bc of the parallelogram abcd is 10. find the length of diagnol ac
Answers: 3
image
Mathematics, 21.06.2019 20:50, kidpryo1
There are three bags: a (contains 2 white and 4 red balls), b (8 white, 4 red) and c (1 white 3 red). you select one ball at random from each bag, observe that exactly two are white, but forget which ball came from which bag. what is the probability that you selected a white ball from bag a?
Answers: 1
Do you know the correct answer?
To the requirement of a customer, the output eta Machine shop is organized so that the number e Com...

Questions in other subjects:

Konu
Physics, 16.04.2021 17:40