5.11. A manufacturing process produces 500 parts per hour. A sample part is selected about every half hour, and after five parts are obtained, the average of these five measurements is plotted on an x control chart.
(a) Is this an appropriate sampling scheme if the assignable cause in the process results in an instantaneous upward shift in the mean that is of very short duration?
(b) If your answer is no, propose an alternative procedure. If your answer is yes, justify.
5.12.
Consider the sampling scheme proposed in Exercise 5.11. Is this scheme appropriate if the assignable cause results in a slow, prolonged upward drift in the mean? If your answer is no, propose an alternative procedure.

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:00, MengXiong1
Tamera puts 15/4 gallons of gasoline in her car. which mixed number represents the gallons of gasoline? a) 2 3/4 gallons b) 3 1/4 gallons c) 3 3/4 gallons d) 4 1/2 gallons answer it's worth a lot of points!
Answers: 3
image
Mathematics, 21.06.2019 17:00, afletcher2000
Jasmine wants to eat at 8: 00pm her meal takes 65mins to cook what time does she need to put the meal in the oven
Answers: 2
image
Mathematics, 21.06.2019 20:00, hlannette7005
Segment an is an altitude of right δabc with a right angle at a. if ab = 2, squared 5 in and nc = 1 in, find bn, an, ac.
Answers: 2
image
Mathematics, 21.06.2019 23:00, moneybabyy38
10x − 5y + 14 = 0 whats the answer pls
Answers: 2
Do you know the correct answer?
5.11. A manufacturing process produces 500 parts per hour. A sample part is selected about every ha...

Questions in other subjects: