Mathematics
Mathematics, 06.07.2021 17:40, ayoismeisalex

A project has four activities (A, B, C, and D) that must be performed sequentially. The probability distributions for the time required to complete each of the activities are as follows. Activity Activity Time (weeks) Probability A 5 0.30 6 0.35 7 0.20 8 0.15 B 3 0.15 5 0.60 7 0.25 C 10 0.10 12 0.25 14 0.35 16 0.25 18 0.05 D 8 0.65 10 0.35 (a) Construct a spreadsheet simulation model to estimate the average length of the project (in weeks) and the standard deviation of the project length. (Use at least 1,000 trials. Round you answers to one decimal place.) average weeks standard deviation weeks (b) What is the estimated probability that the project will be completed in 35 weeks or less

answer
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 12:30, yvngtazz
Derricks dog sitting and darlene's dog sitting are competing for new business. the companies ran the ads shown. which dog sitting service is more economic to use if you need 5 hours of service? explain.
Answers: 1
image
Mathematics, 21.06.2019 23:30, pinkygirlp1662
The triangle shown has a hypotenuse with a length of 13 feet. the measure of angle a is 20 degrees. and the measure of angle b is 70 degrees. which of the following is closest to the length, in feet, of line segment ac? no need to use a calculator to find the trig numbers. each function is listed below. 4.4 5 12.2 35.7
Answers: 2
image
Mathematics, 22.06.2019 00:00, shey89
Cole says the distance between points (-5,0) and (0,-5)is 5 units. is he correct? explain why or why not.
Answers: 1
image
Mathematics, 22.06.2019 00:20, smooth5471
Three students, javier, sam, and corrine, participated in a fundraiser where people donated a certain amount of money per lap that the student ran. each student also had some initial donations that were collected before the run. the equations that represent each student's total donation, y, based on the number of laps ran, x, is shown below. match each equation with the correct rate of change for that student.
Answers: 1
Do you know the correct answer?
A project has four activities (A, B, C, and D) that must be performed sequentially. The probability...

Questions in other subjects:

Konu
Mathematics, 11.09.2020 02:01
Konu
Mathematics, 11.09.2020 02:01
Konu
Mathematics, 11.09.2020 02:01
Konu
Mathematics, 11.09.2020 02:01
Konu
Mathematics, 11.09.2020 02:01
Konu
Mathematics, 11.09.2020 02:01
Konu
Mathematics, 11.09.2020 02:01
Konu
Mathematics, 11.09.2020 02:01
Konu
Mathematics, 11.09.2020 02:01
Konu
Mathematics, 11.09.2020 02:01