Mathematics
Mathematics, 29.06.2021 02:40, tori362

It takes about 14 person-hours of labor to break up a driveway and clear away the rubble. It takes about 8 person-hours of labor to pour and smooth concrete for the new driveway. About how many person-hours of labor does it take to break up a driveway, clear away the rubble, pour the concrete, and smooth the concrete?

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 19:30, Nicoleycannolii
You are designing a rectangular pet pen for your new baby puppy. you have 30 feet of fencing you would like the fencing to be 6 1/3 feet longer than the width
Answers: 1
image
Mathematics, 21.06.2019 20:00, nanda22
Mat bought a phone for $100. he has to pay $30 per mouth. if he has paid $640 in total, how many mouth has he had the phone?
Answers: 2
image
Mathematics, 21.06.2019 21:30, unknowntay04
Which equation shows the variable terms isolated on one side and the constant terms isolated on the other side for the equation -1/2x+3=4-1/4x? a. -1/4x=1 b. -3/4x=1 c. 7=1/4x d. 7=3/4x
Answers: 1
image
Mathematics, 22.06.2019 01:00, vanenav2003ovf1lz
Drag statements and reasons to each row to show why the slope of the line between d and e is the same as the slope between e and f, given that triangles a and b are similar.
Answers: 2
Do you know the correct answer?
It takes about 14 person-hours of labor to break up a driveway and clear away the rubble. It takes a...

Questions in other subjects: