Mathematics
Mathematics, 29.06.2021 02:40, anggar20

You work on a concrete crew starting a construction project. Once the pouring begins, it must continue non-stop until it is completed. Your crew will work an 8-hour shift along with two other crews. The total project requires 175,000 yards of concrete. Your supervisor estimates that each crew will pour around 1200 yards per hour. How many consecutive days should you plan to work on this project?A recipe requires 1.5 kilograms of eggs. How much is this in pounds?

answer
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 14:20, priscillavaladez1112
Twenty-five percent of the customers entering a grocery store between 5 p. m. and 7 p. m. use an express checkout. consider five randomly selected customers, and let x denote the number among the five who use the express checkout.
Answers: 1
image
Mathematics, 21.06.2019 15:00, 5924000264
Find parametric equations for the line tangent to the curve of intersection of the surfaces at the given point. surfaces: xsquared2plus+2yplus+2zequals=1212 yequals=33 point: left parenthesis 1 comma 3 comma five halves right parenthesis
Answers: 1
image
Mathematics, 21.06.2019 15:50, rex1578
Create and solve a linear equation that represents the model, where squares and triangles are shown evenly balanced on a balance beam. assume the weight of a square is 1 unit and the weight of a triangle is unknown.
Answers: 3
image
Mathematics, 21.06.2019 16:20, jaueuxsn
Tomas is making trail mix using granola and walnuts. he can spend a total of $12 on the ingredients. he buys 3 pounds of granola that costs $2.00 per pound. the walnuts cost $6 per pound. he uses the equation to represent the total cost, where x represents the number of pounds of granola and y represents the number of pounds of walnuts. he solves the equation for y, the number of pounds of walnuts he can buy. answer- b tomas added 6 to both sides of the equation instead of subtracting 6. just took the test
Answers: 1
Do you know the correct answer?
You work on a concrete crew starting a construction project. Once the pouring begins, it must contin...

Questions in other subjects:

Konu
Mathematics, 16.02.2021 21:00