Mathematics
Mathematics, 24.06.2021 03:00, marie0321rivera67

An oil-drilling rig has dug a hole to a depth of -60 ft. after one full day and night of continuous use. The rate of the rig stayed constant over that time.
Part A: The rig will be used to dig a second hole with a depth of -150 ft at the same rate as
before. How many hours will the rig take to complete digging the hole?

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 22:30, alliaespino
Awoman has 14 different shirts: 10 white shirts and 4 red shirts. if she randomly chooses 2 shirts to take with her on vacation, then what is the probability that she will choose two white shirts? show your answer in fraction and percent, round to the nearest whole percent.
Answers: 1
image
Mathematics, 21.06.2019 23:00, tonimgreen17p6vqjq
Which graph represents the linear function below? y-3=1/2(x+2)
Answers: 2
image
Mathematics, 21.06.2019 23:30, jordynp2615
In the diagram, ab is tangent to c, ab = 4 inches, and ad = 2 inches. find the radius of the circle.
Answers: 2
image
Mathematics, 22.06.2019 05:30, alee885
The path traveled by a bottlenose dolphin as it jumps out of water is modeled by the equation y=-0.4+3x, where t is the height above water and x is the horizontal distance in feet. if a beam of light is shone upward at an angle modeled by the equation x+y=10, at what height from the waters surface will the beam of light hit the dolphin
Answers: 2
Do you know the correct answer?
An oil-drilling rig has dug a hole to a depth of -60 ft. after one full day and night of continuous...

Questions in other subjects: