Mathematics, 17.06.2021 02:00, cece4874
Joy recently hired a plumber to do some necessary work. On the final bill, Joy was charged a total of $1000. The amount listed for parts was $240 and the rest of the bill was for labor. If the hourly rate for labor was $38, how many hours of labor was needed to complete the job?
(A) First write an equation you can use to answer this question. Use x as your variable. The equation is
(B) Solve your equation in part (A) to find the number of labor hours needed to do the job. The number of labor hours was .
Answers: 2
Mathematics, 21.06.2019 14:30, chintiffany4779
Describe in detail how you would construct a 95% confidence interval for a set of 30 data points whose mean is 20 and population standard deviation is 3. be sure to show that you know the formula and how to plug into it. also, clearly state the margin of error.
Answers: 3
Mathematics, 21.06.2019 16:20, tmantooth7018
The lengths of nails produced in a factory are normally distributed with a mean of 4.91 centimeters and a standard deviation of 0.05 centimeters. find the two lengths that separate the top 4% and the bottom 4%. these lengths could serve as limits used to identify which nails should be rejected. round your answer to the nearest hundredth, if necessary.
Answers: 3
Mathematics, 22.06.2019 02:00, CJunc95801
The statement tan theta= -12/5, csc theta=-13/12, and the terminal point determained by theta is in quadrant two
Answers: 3
Joy recently hired a plumber to do some necessary work. On the final bill, Joy was charged a total o...
Physics, 18.09.2019 13:30
Mathematics, 18.09.2019 13:30
Mathematics, 18.09.2019 13:30
Social Studies, 18.09.2019 13:30