Mathematics
Mathematics, 09.06.2021 14:00, guesswhoitis21

A bicycle manufacturing company makes a particular type of bike. Each child bike requires 4 hours to build and 4 hours to test. Each adult bike requires 6 hours to build and 4 hours to test. With the number of workers, the company is able to have up to 120 hours of building time and 100 hours of testing time for a week. If c represents child bikes and a represents adult bikes, can the company build 20 child bikes and 6 adult bikes in a week. No, because the bike order does not meet the restrictions of 4c + 6a ≤ 120 and 4c + 4a ≤ 100
No, because the bike order does not meet the restrictions of 4c + 4a ≤ 120 and 6c + 4a ≤ 100
Yes, because the bike order meets the restrictions of 4c + 6a ≤ 120 and 4c + 4a ≤ 100
Yes, because the bike order meets the restrictions of 4c + 4a ≤ 120 and 6c + 4a ≤ 100

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 17:30, Hilljos018
The length of triangle base is 26. a line, which is parallel to the base divides the triangle into two equal area parts. find the length of the segment between triangle legs.
Answers: 3
image
Mathematics, 21.06.2019 18:30, nina288
Astuntman jumping off a 20-m-high building is modeled by the equation h=20-5t^2, where t is the same in seconds. a high-speed camera is ready to film him between 15m and 10m above the ground. for which interval of time should the camera film him?
Answers: 1
image
Mathematics, 22.06.2019 00:00, 001136843
The graph shows the amount of money noah earned based on the number of lawns he cut. which list shows the dependent quantities in the graph?
Answers: 3
image
Mathematics, 22.06.2019 01:00, christinaruckepegvlp
What is 10+10+20 about the origin the square root of a triangle.
Answers: 3
Do you know the correct answer?
A bicycle manufacturing company makes a particular type of bike. Each child bike requires 4 hours to...

Questions in other subjects:

Konu
Geography, 16.04.2020 21:11