Answers: 2
Mathematics, 21.06.2019 21:30, mandyangle01
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
Mathematics, 22.06.2019 01:00, sdwhitneyhillis
Arrange the steps to solve this system of linear equations in the correct sequence. x + y = -2 2x – 3y = -9 tiles subtract 3x + 3y = -6 (obtained in step 1) from 2x – 3y = -9 (given) to solve for x. substitute the value of x in the first equation (x + y = -2) to get y = 1. the solution for the system of equations is (-3, 1). x = -15 the solution for the system of equations is (-15, 13). add 3x + 3y = -6 (obtained in step 1) to 2x – 3y = -9 (given), and solve for x. x = -3 substitute the value of x in the first equation (x + y = -2) to get y = 13. multiply the first equation by 3: 3(x + y) = 3(-2) 3x + 3y = -6.
Answers: 1
Simplify 4 by 5 + 2 in bracket 3 minus 2 by 3 in bracket​...
Chemistry, 25.07.2019 04:00
Mathematics, 25.07.2019 04:00
Mathematics, 25.07.2019 04:00
Mathematics, 25.07.2019 04:00