Mathematics, 07.06.2021 14:00, orgaprince
The Shredder, Inc. produces two types of paper shredders, home and office. The office model requires 4
hours to assembly and 6 finishing work units for finishing work, the home model requires 3 hours to
assemble and 6 finishing work units for finishing. The maximum number of assembly hours available is 72
per day, and the maximum number of finishing hours available is 132 per day.
Let 2 = the number of office model shredders produced per day and y = the number of home model
shredders produced per day.
Write the system of inequalities that represents the maximum number of shredders that can be produced in
one day.
NOTE: 4 inequalities are expected.
=<72
< 132ll
Answers: 2
Mathematics, 21.06.2019 19:30, youcandoit13
Click the arrows to advance or review slides. mapping carbohydrates to food carbohydrates (grams) 15 food (quantity) bread (1 slice) pasta (1/3 cup) apple (1 medium) mashed potatoes (1/2 cup) broccoli (1/2 cup) carrots (1/2 cup) milk (1 cup) yogurt (6 oz.) 12 12 is jennifer's relation a function? yes no f 1 of 2 → jennifer figure out the difference between a function and a relation by answering the questions about her food choices
Answers: 2
The Shredder, Inc. produces two types of paper shredders, home and office. The office model requires...
Biology, 25.09.2019 13:30
Chemistry, 25.09.2019 13:30
Biology, 25.09.2019 13:30