Mathematics
Mathematics, 05.06.2021 08:00, tanviknawale

Designing 100 pieces of a PCB, engineer's find that the batch has a M. A.D of (1.5) . A second batch with 100 pieces has a M. A.D of (0.20) Which batch has less variability and what does it mean for the production engineer's? M. A.D(Mean Absolute Deviation) ​

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 18:00, RoyalGurl01
Identify which functions are linear or non-linear. a. f(x) = x2 + 1 b. f(x) = 2x + 5 c. f(x) = x 2 + 3 d. f(x) = 3 x + 7 e. f(x) = 4x + 10 2 - 5
Answers: 1
image
Mathematics, 21.06.2019 19:30, warreliz
Plz. yesterday, the snow was 2 feet deep in front of archie’s house. today, the snow depth dropped to 1.6 feet because the day is so warm. what is the percent change in the depth of the snow?
Answers: 1
image
Mathematics, 22.06.2019 00:30, aylineorozco836
If m_b=mzd= 43, find mzc so that quadrilateral abcd is a parallelogram o 86 137 o 129 43 description
Answers: 1
image
Mathematics, 22.06.2019 01:00, dyllanmasters99
Determine the intercepts of the line that passes through the following points. (15,-3)(15,−3) (20,-5)(20,−5) (25,-7)(25,−7)
Answers: 1
Do you know the correct answer?
Designing 100 pieces of a PCB, engineer's find that the batch has a M. A.D of (1.5) . A second batch...

Questions in other subjects:

Konu
Mathematics, 23.06.2019 02:00
Konu
Mathematics, 23.06.2019 02:00