Mathematics
Mathematics, 05.06.2021 08:00, tanviknawale

Designing 100 pieces of a PCB, engineer's find that the batch has a M. A.D of (1.5) . A second batch with 100 pieces has a M. A.D of (0.20) Which batch has less variability and what does it mean for the production engineer's? M. A.D(Mean Absolute Deviation) ​

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:10, GgRed
Abox contains 1 plain pencil and 4 pens. a second box contains 5 color pencils and 5 crayons. one item from each box is chosen at random. what is the probability that a plain pencil from the first box and a color pencil from the second box are selected? write your answer as a fraction in simplest form.
Answers: 1
image
Mathematics, 21.06.2019 18:20, holmesleauja
Type the correct answer in each box. use numerals instead of words. if necessary, use / for the fraction bar. consider the given table.
Answers: 1
image
Mathematics, 21.06.2019 20:30, nayelieangueira
Kyle and elijah are planning a road trip to california. their car travels 3/4 of a mile per min. if they did not stop driving, how many miles could kyle and elijah drove in a whole day? ? 1 day = 24 hours. plzzz write a proportion i will give you 100 points
Answers: 1
image
Mathematics, 21.06.2019 22:00, angeline2004
Given the quadratic function f(x)=3x^2-24x+49 a. use “completing the squares” to convert the quadratic function into vertex form b. state the vertex c. find the x and y intercepts d. graph the function
Answers: 1
Do you know the correct answer?
Designing 100 pieces of a PCB, engineer's find that the batch has a M. A.D of (1.5) . A second batch...

Questions in other subjects:

Konu
Mathematics, 07.07.2019 00:30
Konu
Mathematics, 07.07.2019 00:30