Mathematics
Mathematics, 03.06.2021 05:10, barbar12345

A manufacturing company currently uses 24 workers to load and unload trucks. Each worker can move an average of 14 boxes per minute. A robotics firm has built a robot that can load and unload boxes at the rate of 21 boxes per minute. How many robots Will it take to do the same job is 24 humans

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 14:00, kassidyopry15
The table shows the distance traveled over time while traveling at a constant speed.
Answers: 1
image
Mathematics, 21.06.2019 14:30, garrettrhoad
The amount of money, in dollars, in an account after t years is given by a = 1000(1.03)^t. the initial deposit into the account was $_^a0 and the interest rate was _a1% per year. only enter numbers in the boxes. do not include any commas or decimal points^t. the initial deposit into the account was $__^a0 and the interest rate is % per year.
Answers: 2
image
Mathematics, 21.06.2019 21:30, Caixiayang3613
Look at the figure below: triangle abc is a right triangle with angle abc equal to 90 degrees. the length of ac is 5 units and the length of ab is 4 units. d is a point above c. triangle adc is a right triangle with angle dac equal to 90 degrees and dc parallel to ab. what is the length, in units, of segment cd?
Answers: 1
image
Mathematics, 22.06.2019 00:00, ThunderThighsM8
Ineed here’s a picture of the question
Answers: 1
Do you know the correct answer?
A manufacturing company currently uses 24 workers to load and unload trucks. Each worker can move an...

Questions in other subjects:

Konu
Mathematics, 14.04.2020 17:51