Mathematics
Mathematics, 01.06.2021 21:20, ybetancourt1

if 4 men can built a wall in 6 days 4 hours then how many men required to built the same wall in 2days 4 hours?​

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 15:10, sierradanielle9280
The highest point on earth is the peak of mount everest if you climb to the top you would be approximately 29,035 feet above sea level at remembering that amount is 5280 feet percentage of the height of the mountain would you have to climb to reach a point 2 miles above sea level
Answers: 2
image
Mathematics, 21.06.2019 22:20, gudon986732
Factor the polynomial. b^2 + 4b + 4
Answers: 2
image
Mathematics, 22.06.2019 00:50, jasmine77723
How does the graph of y = 3x compare to the graph of y = 3-x?
Answers: 1
image
Mathematics, 22.06.2019 01:30, alliemeade1
Jon’s weight loss for each week of the month is 5 lbs., 2.5 lbs., and 2.5 lbs. he gained 3.5 lbs. the last week. if jon originally weighed 198 lbs., how much does he weigh now?
Answers: 1
Do you know the correct answer?
if 4 men can built a wall in 6 days 4 hours then how many men required to built the same wall in 2da...

Questions in other subjects:

Konu
Mathematics, 27.10.2019 07:43