Mathematics
Mathematics, 01.06.2021 07:20, trinityrae4657

A small engineering company has an old machine which produces 30 components per hour, and has recently installed a new machine which produces 40 components per hour. Yesterday, both were in operation for different periods of time. If 545 components were produced when the total number of hours of operation was 15 hours, determine for how many hours each machine was operating. Please use system of linear equations by elimination OR substitution. I also need the work please.

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 20.06.2019 18:04, leannamat2106
How do i get the answer for 2/3 * 10/3
Answers: 2
image
Mathematics, 21.06.2019 19:00, KMyers
The fence around a quadrilateral-shaped pasture is 3a^2+15a+9 long. three sides of the fence have the following lengths: 5a, 10a-2, a^2-7. what is the length of the fourth side of the fence?
Answers: 1
image
Mathematics, 21.06.2019 20:00, xxaurorabluexx
Credit card a offers an introductory apr of 3.4% for the first three months and standard apr of 15.7% thereafter,
Answers: 3
image
Mathematics, 21.06.2019 22:00, kharmaculpepper
Question 13 (1 point) jerome is starting a new job. his contract states he will earn $42,000 the first year, and will get a 4% raise per year. which function s(x) represents jerome's salary after a certain number of years, x?
Answers: 1
Do you know the correct answer?
A small engineering company has an old machine which produces 30 components per hour, and has recent...

Questions in other subjects:

Konu
Health, 04.03.2021 23:30
Konu
Mathematics, 04.03.2021 23:30
Konu
Mathematics, 04.03.2021 23:30
Konu
Mathematics, 04.03.2021 23:30