Mathematics, 27.05.2021 01:00, stevensquad638
When building a house, the number of days required to build varies inversely with
with the number of workers. One house was built in 11 days by 49 workers. How
many days would it take to build a similar house with 7 workers?
Answers: 2
Mathematics, 21.06.2019 16:20, whitneyt3218
7.(03.01 lc)which set represents the range of the function shown? {(-1, 5), (2,8), (5, 3), 13, -4)} (5 points){-1, 2, 5, 13){(5, -1), (8, 2), (3,5), (-4, 13)){-4, 3, 5, 8}{-4, -1, 2, 3, 5, 5, 8, 13}
Answers: 3
Mathematics, 21.06.2019 23:30, paolaf3475
Without multiplying, tell which product is larger and why. 5 × 1/3 or 5 × 2/3 a)5 × 1/3 because 1/3 is less than 2/3 b) 5 × 1/3 because 1/3 is greater than 2/3 c) 5 × 2/3 because 1/3 is less than 23 d) 5 × 23 because 1/3 is greater than 2/3
Answers: 1
Mathematics, 21.06.2019 23:30, bnation5970
Mason and christian go to the movie theater and purchase refreshments for their friends. mason spends a total of $45.75 on 3 bags of popcorn and 6 drinks. christian spends a total of $71.50 on 6 bags of popcorn and 4 drinks. write a system of equations that can be used to find the price of one bag of popcorn and the price of one drink. using these equations, determine and state the price of a drink, to the nearest cent.
Answers: 2
When building a house, the number of days required to build varies inversely with
with the number o...
Mathematics, 11.09.2020 01:01
Mathematics, 11.09.2020 01:01
Mathematics, 11.09.2020 01:01
Social Studies, 11.09.2020 01:01
Mathematics, 11.09.2020 01:01
Mathematics, 11.09.2020 01:01
Mathematics, 11.09.2020 01:01
Mathematics, 11.09.2020 01:01
Mathematics, 11.09.2020 01:01
Mathematics, 11.09.2020 01:01