Mathematics
Mathematics, 25.05.2021 17:40, rvkanneh1713

if 15 workers can build a wall in 48 hours how many workers will be required to do the same work in 30 hours​

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 22:00, jessejames48
The coordinates r(1, -3), s(3, -1) t(5, -7) form what type of polygon? a right triangle an acute triangle an equilateral triangle an obtuse triangle
Answers: 1
image
Mathematics, 22.06.2019 00:00, mwest200316
Ineed with the quizzes in apex mathematics ii
Answers: 1
image
Mathematics, 22.06.2019 00:00, wannaoneisforever
The average length of a king cobra is 3.7 m. the record length is 1.88 m longer than the average. how long is the record holder?
Answers: 1
image
Mathematics, 22.06.2019 01:00, lucyamine0
Atriangle has side lengths of x, x+11, and 3x+5. what is the perimeter?
Answers: 1
Do you know the correct answer?
if 15 workers can build a wall in 48 hours how many workers will be required to do the same work in...

Questions in other subjects: