Mathematics
Mathematics, 17.05.2021 15:00, famouzgal

10. A company is considering building a manufacturing plant. They determined the weekly production coast at site A to be A(x) = 3x2 while the production cost at site be is B(x) =
8x + 3, where x represents the number of products, in hundreds, and A(x) and B(x) are
the production costs in hundreds of dollars.

answer
Answers: 2

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 13:00, nikkera03
Solve 5 tan x = 5√(3) for 0° ≤ x ≤ 180°. a. 60° b. 150° c. 30° d. 120°
Answers: 1
image
Mathematics, 22.06.2019 02:30, mikayla843
Which of the following multiplication expressions can be modeled by the tiles shown? check all that apply. 8(3) = 24 6(4) = 24 (3)(12) = 36 24(3) = 72 3(8) = 24 2(12) = 24
Answers: 2
image
Mathematics, 22.06.2019 03:10, CM0
The coverage of a base station of a telecommunication company forms a disk with a radius of (kilometers). let be the distance of a cellphone from a base station. assume that the location of cellphones in use are randomly uniformly distributed within the disk. calculate the mean and variance for the random variable.
Answers: 3
image
Mathematics, 22.06.2019 05:00, christingle2004
Students planted 6 equals size gardens on earth day. they divided each garden into three equal sections and planted herbs in 2 of the 3 sections what fraction of the gardens did the students plant with herbs.
Answers: 1
Do you know the correct answer?
10. A company is considering building a manufacturing plant. They determined the weekly production...

Questions in other subjects:

Konu
Mathematics, 13.10.2019 06:30