Mathematics
Mathematics, 16.05.2021 20:00, ashrobbb

A team of 5 bricklayers and 1 electrician is working at a construction site. The team finishes the job and is paid. The bricklayers receive $500 each, and the electrician
receives $100 more than the average salary of the entire team. How many dollars does
the electrician get?

answer
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 15:00, jaileen84
In a school 2/3 of the students study a language of those who study a language 2/5 study french
Answers: 2
image
Mathematics, 21.06.2019 20:30, strodersage
Ametal rod is 2/5 meters long. it will be cut into pieces that are each 1/30 meters long. how many pieces will be made from the rod?
Answers: 1
image
Mathematics, 21.06.2019 23:30, kiaraceballos2880
It takes an ant farm 3 days to consume 1/2 of an apple. at that rate, in how many days will the ant farm consume 3 apples
Answers: 1
image
Mathematics, 21.06.2019 23:30, tumadreeve7852
Select the correct answer and solve for y
Answers: 2
Do you know the correct answer?
A team of 5 bricklayers and 1 electrician is working at a construction site. The team finishes the...

Questions in other subjects:

Konu
Mathematics, 14.10.2019 11:30