Mathematics
Mathematics, 11.05.2021 21:00, nadiareese

Two companies working together can clear a parcel of land in 9 hours Working alone, it would take Company A 4 hours longer to clear the land than it would Company
B. How long would it take Company B to clear the parcel of land alone? (Round your answer to the nearest tenth.)

answer
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 22:00, jladinosolarsee
If tan2a=cot(a+60), find the value of a, where 2a is an acute angle
Answers: 1
image
Mathematics, 21.06.2019 23:00, Gaby702
What is the sum of these mixed numbers 4 2/3+ 3 1/9
Answers: 2
image
Mathematics, 22.06.2019 00:30, oof40
An electrician cuts a 136 foot long piece of cable. one piece is 16 feet less than 3 times the length of the other piece. find the length of each piece
Answers: 1
image
Mathematics, 22.06.2019 03:30, kristaaune2374
Ben and cam are scuba diving. ben is 15.815.8 meters below the surface of the water. cam is 4.24.2 meters above ben. what is cam's position relative to the surface of the water? choose 1 choose 1 (choice a) a 11.611.6 meters above the surface of the water (choice b) b 11.611.6 meters below the surface of the water (choice c) c 2020 meters above the surface of the water (choice d) d 20 meters below the surface of the water
Answers: 1
Do you know the correct answer?
Two companies working together can clear a parcel of land in 9 hours Working alone, it would take Co...

Questions in other subjects:

Konu
Mathematics, 19.03.2020 21:42