As part of the quality-control program for a catalyst manufacturing line, the raw materials (alumina and a binder) are tested for purity. The process requires that the purity of the alumina be greater than 84%. A random sample from a recent shipment of alumina yielded the following results (in percent): 93.2, 87.0, 92.1, 90.1, 87.1, and 93.4.
A hypothesis test will be done to determine whether or not to accept the shipment.
a. State the appropriate null and alternate hypotheses.
b. Compute the P-value.
c. Should the shipment be accepted? Explain.

answer
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 12:30, maddied2443
What basic trigonometric identity would you use to verify that csc x sec x cot x = csc^(2)x
Answers: 1
image
Mathematics, 21.06.2019 17:30, mikemofun9079
5/6+7/8what is the answer sealsdbdbshd
Answers: 2
image
Mathematics, 21.06.2019 18:30, Katlyndavis01
What is the answer to this question? i'm a bit stumped. also how do i do it? 5(x - 4) = 2(x + 5)
Answers: 1
image
Mathematics, 21.06.2019 19:30, ramose7021
Show your workcan a right triangle have this sides? *how to prove it without using the pythagorean theorema*
Answers: 2
Do you know the correct answer?
As part of the quality-control program for a catalyst manufacturing line, the raw materials (alumina...