Marcy Fetter, a staff analyst at the Los Angeles plant of Computer Products Corporation, is assigned to the team that is developing the process design for producing an RFID sensor. The corporate planning group in San Jose, California has contacted her and has asked how confident the design group is about completing the project in 60 days. She has developed these estimated time durations in days for the project:
Activity Immediate Predecessor Activities Optimistic Time Most Likely Time Pessimistic Time
A - 10 12 15
B A 6 10 14
C A 10 15 20
D A 9 9 18
E B 5 6 8
F C, E 10 12 13
G B 12 14 16
H B, D 18 21 24
I B, D 10 15 20
J F, G,H 8 10 14
Required:
a. Determine the expected duration of the project.
b. What is the critical path?
c. Using the path determined above, what is the probability that the project will take longer than 56 days to complete?
Answers: 2
Mathematics, 21.06.2019 19:30, shay03littletop5kx2p
Simplify (1/2)4th power a. (1/16) b.(1/8) c.(1/4)
Answers: 2
Mathematics, 21.06.2019 20:20, SESDMANS9698
Select the correct answer from each drop-down menu. the length of a rectangle is 5 inches more than its width. the area of the rectangle is 50 square inches. the quadratic equation that represents this situation is the length of the rectangle is inches.
Answers: 1
Mathematics, 21.06.2019 22:30, mackenziepaige6525
The median for the given set of six ordered data values is 29.5 9 12 25 __ 41 48 what is the missing value?
Answers: 1
Mathematics, 21.06.2019 23:30, shreyapatel2004
What is the area of a triangle with a base of 7x and height of 8x expressed as a monomial? question 5 options: 1x 15x2 28x2 56x2
Answers: 1
Marcy Fetter, a staff analyst at the Los Angeles plant of Computer Products Corporation, is assigned...
Mathematics, 31.05.2021 01:40
Mathematics, 31.05.2021 01:40
Business, 31.05.2021 01:40
English, 31.05.2021 01:40
Mathematics, 31.05.2021 01:40
Social Studies, 31.05.2021 01:40