Mathematics
Mathematics, 06.05.2021 04:20, marcucciisabella

You have a summer job with a pool company, you are filling a swimming pool with water. It already has 3 feet (36 inches) of water in it, and is filling at a rate of 4 inches per hour. a) Define the variables:
y =
x =
a =
b =

b) Write the equation that represents this situation.

c) After the 6 hours, how much water will there be in the pool?

d) How long will it take to reach a height of 72 inches?

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 15:30, nsuleban9524
Astore manager records the total visitors and sales, in dollars, for 10 days. the data is shown in the scatter plot. what conclusion can the store manager draw based on the data? question 3 options: an increase in sales causes a decrease in visitors. an increase in sales is correlated with a decrease in visitors. an increase in visitors is correlated with an increase in sales.
Answers: 1
image
Mathematics, 21.06.2019 21:50, spookymod8967
What is the 17th term in the arithmetic sequence in which a6 is 101 and a9 is 83
Answers: 3
image
Mathematics, 21.06.2019 22:00, pandyjunk3981
Let event a = you roll an even number on the first cube. let event b = you roll a 6 on the second cube. are the events independent or dependent? why?
Answers: 1
image
Mathematics, 22.06.2019 01:00, cthompson1107
First work with stencil one. use a combination of reflections, rotations, and translations to see whether stencil one will overlap with the original pattern. list the sequence of rigid transformations you used in your attempt, noting the type of transformation, the direction, the coordinates, and the displacement in
Answers: 3
Do you know the correct answer?
You have a summer job with a pool company, you are filling a swimming pool with water. It already ha...

Questions in other subjects:

Konu
Mathematics, 18.10.2019 21:40