Mathematics
Mathematics, 04.05.2021 01:50, mashejaj

A certain plant runs three shifts per day. Of all the items produced by the plant, 50% of them are produced on the first shift, 30% on the second shift, and 20% on the third shift. Of all the items produced on the first shift, 1% are defective, while 2% of the items produced on the second shift and 3% of the items produced on the third shift are defective. An item is sampled at random from the day's production, and it turns out to be defective. What is the probability that it was manufactured during the first shift

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 23:30, odellbeckham7171
When a valve is open 281 gallons of water go through it in one hour the number of gallons that would go through in 94 hours is
Answers: 1
image
Mathematics, 21.06.2019 23:30, heybro12
The perimeter of an equilateral triangle is 4 cm more than the perimeter of a square and the length of a side of the triangle is 8 cm more than the length of a side of the aware. find the length of a side of the equilateral triangle
Answers: 1
image
Mathematics, 21.06.2019 23:30, math3130
Which number is located at point a on the number line? a number line is shown from negative 10 to 10 with each interval mark on the number line representing one unit. point a is labeled one interval mark to the right of negative 5.
Answers: 1
image
Mathematics, 22.06.2019 02:10, kinqlouiee2253
Of jk j(–25, 10) k(5, –20). is y- of l, jk a 7: 3 ? –16 –11 –4 –1
Answers: 1
Do you know the correct answer?
A certain plant runs three shifts per day. Of all the items produced by the plant, 50% of them are p...

Questions in other subjects: