Mathematics
Mathematics, 21.04.2021 01:00, chrisraptorofficial

The Boone Weavers make shawls and afghans. They spin yarn, dye yarn, and weave yarn for each. A shawl requires 1 hour of spinning, 1 hour of dyeing and 1

hour of weaving. An afghan requires 2 hours of spinning, 1 hour of dyeing, and 4

hours of weaving. In a week, there is time to spend at most 13 hours spinning, 10

hours dyeing and 30 hours weaving. How many shawls and how many afghans

should be made to maximize profit if shawls bring in a profit of $25 and afghans

bring in a profit of $40?

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 19:00, milhai0627a
Acompany manufactures large valves, packed in boxes. a shipment consists of 1500 valves packed in 75 boxes. each box has the outer dimensions 1.2 x 0.8 x 1.6 m and the inner dimensions 1.19 x 0.79 x 1.59 m. the boxes are loaded on a vehicle (truck + trailer). the available capacity in the vehicle combination is 140 m3. each valve has a volume of 0.06 m3. - calculate the load factor on the box level (%). - calculate the load factor on the vehicle level (%). - calculate the overall load factor (%).
Answers: 1
image
Mathematics, 21.06.2019 19:30, isabelgarcia188
βˆ†red β‰… βˆ† by rule will give brainiest if possible
Answers: 2
image
Mathematics, 21.06.2019 20:00, bfgnnnbddf6830
How do i multiply two digit numbers
Answers: 1
image
Mathematics, 21.06.2019 22:30, Shiey0409
Which of the following represents the length of a diagonal of this trapezoid?
Answers: 1
Do you know the correct answer?
The Boone Weavers make shawls and afghans. They spin yarn, dye yarn, and weave yarn for each. A sh...

Questions in other subjects: