Mathematics
Mathematics, 14.11.2019 02:31, GamerGirl15

Amachine cuts a strip of carpet into two pieces. the length of the smaller piece is 5 meters greater than the length of the larger piece. if the length of the smaller piece is 12 meters, the length of the bigger piece is 13.5 14 20 28 meters and the total length of the carpet is 25.5 26 32 40 meters.

answer
Answers: 3

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 16:20, whitneyt3218
7.(03.01 lc)which set represents the range of the function shown? {(-1, 5), (2,8), (5, 3), 13, -4)} (5 points){-1, 2, 5, 13){(5, -1), (8, 2), (3,5), (-4, 13)){-4, 3, 5, 8}{-4, -1, 2, 3, 5, 5, 8, 13}
Answers: 3
image
Mathematics, 21.06.2019 21:30, aniacopenowell7
How many terms does the polynomial x^2 y^2 have
Answers: 1
image
Mathematics, 22.06.2019 01:00, jghdvine
Have yall ever just farted and was like, i farted.
Answers: 2
image
Mathematics, 22.06.2019 02:00, AnastasiaJauregui
If p(x) is the total value of the production when there are x workers in a plant, then the average productivity of the workforce at the plant is a(x) = p(x) x . (a) find a'(x). a'(x) = xp'(x) − p(x) x a'(x) = xp'(x) − p(x) x2 a'(x) = p'(x) − p(x) x a'(x) = xp'(x) − p'(x) x2 a'(x) = p'(x) − xp(x) x2 why does the company want to hire more workers if a'(x) > 0? a'(x) > 0 ⇒ a(x) is ; that is, the average productivity as the size of the workforce increases. (b) if p'(x) is greater than the average productivity, which of the following must be true? p'(x) − xp(x) > 0 p'(x) − xp(x) < 0 xp'(x) − p'(x) > 0 xp'(x) − p(x) < 0 xp'(x) − p(x) > 0
Answers: 2
Do you know the correct answer?
Amachine cuts a strip of carpet into two pieces. the length of the smaller piece is 5 meters greater...

Questions in other subjects:

Konu
Mathematics, 31.08.2021 14:00
Konu
Mathematics, 31.08.2021 14:00