Mathematics, 26.08.2019 08:20, dinosaur10
Aceramics workshop makes wreaths, trees, and sleighs for sale at christmas. a wreath takes 3 hours to prepare, 2 hours to paint, and 9 hours to fire. a tree takes 15 hours to prepare, 3 hours to paint, and 4 hours to fire. a sleigh takes 4 hours to prepare, 17 hours to paint, and 7 hours to fire. if the workshop has 108 hours for preparation time, 80 hours for painting, and 104 hours for firing, how many of each can be made?
Answers: 1
Mathematics, 21.06.2019 16:30, chmereaustin1
An empty bucket is placed under a faucet dripping at a constant rate of 4 milliliters per minute. with the given information, which of these statements is a reasonable conclusion? a there will be 24 milliliters of water in the bucket after 16 hour. b there will be 60 milliliters of water in the bucket after 14 hour. c there will be 160 milliliters of water in the bucket after 20 minutes. d there will be 100 milliliters of water in the bucket after 40 minutes.
Answers: 1
Mathematics, 21.06.2019 20:30, yfgkeyonna
On a cm grid, point p has coordinates (3,-1) and point q has coordinates (-5,6) calculate the shortest distance between p and q give your answer to 1 decimal place
Answers: 2
Aceramics workshop makes wreaths, trees, and sleighs for sale at christmas. a wreath takes 3 hours t...
Mathematics, 01.05.2021 18:30
Mathematics, 01.05.2021 18:30
English, 01.05.2021 18:30