Last geometry questions i really need it
...
Answers: 3
Mathematics, 21.06.2019 21:30, mandyangle01
Using pert, adam munson was able to determine that the expected project completion time for the construction of a pleasure yacht is 21 months, and the project variance is 4. a) what is the probability that the project will be completed in 17 months? b) what is the probability that the project will be completed in 20 months? c) what is the probability that the project will be completed in 23 months? d) what is the probability that the project will be completed in 25 months? e) what is the due date that yields a 95% chance of completion?
Answers: 3
Mathematics, 22.06.2019 00:00, jonmorton159
Need plz been trying to do it for a long time and still haven’t succeeded
Answers: 1
Mathematics, 22.06.2019 00:20, brainist71
Does the construction demonstrate how to copy an angle correctly using technology a) yes the distance between points a and f was used to create circle h b) yes the distance between points f and g was used to create circle h c) no the distance between points a and f was used to create circle h d) no the distance between points f and g was used to create circle h
Answers: 3
Chemistry, 11.10.2020 03:01
Mathematics, 11.10.2020 03:01
Mathematics, 11.10.2020 03:01
Chemistry, 11.10.2020 03:01
Biology, 11.10.2020 03:01