Mathematics
Mathematics, 22.09.2019 09:50, mmelody5

Abicycle manufacturing company makes a particular type of bike. each child bike requires 4 hours to build and 4 hours to test. each adult bike requires 6 hours to build and 4 hours to test. with the number of workers, the company is able to have up to 120 hours of building time and 100 hours of testing time for a week. if c represents child bikes and a represents adult bikes, determine which system of inequality best explains whether the company can build 20 child bikes and 6 adult bikes in the week. no, because the bike order does not meet the restrictions of 4c + 6a ≤ 120 and 4c + 4a ≤ 100 no, because the bike order does not meet the restrictions of 4c + 4a ≤ 120 and 6c + 4a ≤ 100 yes, because the bike order meets the restrictions of 4c + 6a ≤ 120 and 4c + 4a ≤ 100 yes, because the bike order meets the restrictions of 4c + 4a ≤ 120 and 6c + 4a ≤ 100

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 19:10, slm1595
Pranza plotted point a in the coordinate plane below.
Answers: 2
image
Mathematics, 21.06.2019 21:30, errr5529
On traditional maps, earth is represented in a flat plane, or by euclidean geometry. however, a globe is a more accurate model that comes from elliptical geometry. how does a globe represent the fact that there are no parallel lines in elliptical geometry? the equator is not parallel to any other latitudinal lines. the north and south poles are never connected by a geodesic. the geodesics connecting the north and south poles never intersect. the geodesics connecting the north and south poles intersect at both of the poles.
Answers: 3
image
Mathematics, 22.06.2019 00:30, genesis0523
What line represents the relationship between r and s
Answers: 1
image
Mathematics, 22.06.2019 00:30, zara76
Which unit rate is the lowest price per ounce? (5 points) choice a: 6 ounces of chocolate chips for $2.49 choice b: 8 ounces of chocolate chips for $3.32
Answers: 2
Do you know the correct answer?
Abicycle manufacturing company makes a particular type of bike. each child bike requires 4 hours to...

Questions in other subjects: