Mathematics
Mathematics, 23.09.2019 08:30, imjustdumbsis

Bob works in construction and works 8 hours each day.
(a) if he spends 7/12 of the time mixing cement and the remainder of the time laying bricks. how much time does he spend laying bricks each day?
(b) bob's supervisor wants him to spend the same amount of time mixing cement as well as laying bricks. how much more time must bob spend laying bricks.

answer
Answers: 1

Other questions on the subject: Mathematics

image
Mathematics, 21.06.2019 13:00, KeyesRaveen
Ihave a 69 and an 82. the 69 is worth 40% of my grade and the 82 is worth 15%. can someone tell me my current average grade.
Answers: 1
image
Mathematics, 21.06.2019 14:50, kefernanda40
If g(x) = x+1/ x-2 and h (x) =4 - x , what is the value of ( g*h) (-3)?
Answers: 1
image
Mathematics, 21.06.2019 16:40, madisongibson62
What is the distance between the points (2 -3) and (-6 4) on the coordinate plane
Answers: 1
image
Mathematics, 21.06.2019 18:10, lalaokawami0912
Find the smallest number by which the given number should be divided to make a perfect cube(with steps or the answer will get reported) a.108 b.2187
Answers: 1
Do you know the correct answer?
Bob works in construction and works 8 hours each day.
(a) if he spends 7/12 of the time mixing...

Questions in other subjects:

Konu
Mathematics, 06.07.2019 15:30